Nuclear Engineer I

Washington, South Carolina + 3 more

About the role

<p><strong data-olk-copy-source="MessageBody">The Nuclear Company</strong> is the fastest growing AI tech-enabled startup in the nuclear and energy space, pioneering a fleet-scale approach to building the next generation of nuclear reactors. Through our design-once, build-many model, we're accelerating the deployment of safe, reliable, and affordable nuclear energy.</p> <p><strong>We operate with an AI-first mindset.</strong> Every employee is expected to leverage AI, technology, and the Nuclear Operating System (NOS) as integral components of their role to improve the quality, speed, and impact of their work. We expect every team member to continuously identify opportunities to automate workflows, enhance decision-making, improve processes, and contribute to the ongoing evolution of NOS as a strategic operating capability that enables The Nuclear Company to scale with excellence.</p> <p><strong>We hire people who are driven by purpose, thrive in ambiguity, and are energized by building what has never been built before.</strong> Our team combines intellectual curiosity with high agency, embraces candid feedback and continuous learning, and holds themselves and others to exceptional standards. Our values—<strong>Transparency, Responsibility, Unity, Scrappy, and Tenacity</strong>—guide how we hire, collaborate, and make decisions every day. They are not words on a wall; they are the standard by which we operate. TRUST is the foundation of our safety culture, fostering intellectual honesty, accountability, and open communication, while our values challenge every team member to execute with urgency, humility, resilience, and an unwavering commitment to our mission.</p> <p><strong><span class="TextRun SCXW174644119 BCX0" lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW174644119 BCX0">

About

the role</span></span></strong></p> <p><span data-contrast="auto">The </span><strong><span data-contrast="auto">Engineering I Program</span></strong><span data-contrast="auto"> is The Nuclear Company’s early-career engineering program for exceptional graduating seniors who want to help build the next generation of nuclear infrastructure.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559685":0,"335559738":0,"335559739":0,"335559740":276}"> </span></p> <p><span data-contrast="auto">We are hiring students graduating i</span><span data-contrast="auto">n Spring 2027 </span><span data-contrast="auto">for full-time roles beginning in </span><strong><span data-contrast="auto">Summer 2027</span></strong><span data-contrast="auto">.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559685":0,"335559738":240,"335559739":240,"335559740":276}"> </span></p> <p><span data-contrast="auto">Engineering One is designed for engineers who want more than a traditional entry-level position. Participants will work alongside experienced engineers, constructors, licensing professionals, project leaders, and Members of Nuclear Staff on real problems tied directly to the development and deployment of nuclear projects.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559685":0,"335559738":240,"335559739":240,"335559740":276}"> </span></p> <p><span data-contrast="auto">The program provides broad exposure across the nuclear project lifecycle while building deep technical capability in an assigned discipline. Depending on your background and project needs, you may work across </span><strong><span data-contrast="auto">mechanical engineering, civil and structural engineering, construction and project delivery, nuclear licensing, systems engineering, or related technical functions</span></strong><span data-contrast="auto">.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559685":0,"335559738":240,"335559739":240,"335559740":276}"> </span></p> <p><span data-contrast="auto">From your first day, you will be expected to learn quickly, ask good questions, work rigorously, and contribute to meaningful work.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559685":0,"335559738":240,"335559739":240,"335559740":276}"> </span></p> <p><strong><span class="EOP SCXW174644119 BCX0" data-ccp-props="{"134245417":false,"201341983":0,"335559740":240}">

Responsibilities</span></strong></p> <p><span data-contrast="auto">Engineering I participants will typically begin in one of the following areas while gaining exposure to the broader nuclear project lifecycle.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":240,"335559739":240,"335559740":240}"> </span></p> <p><strong><span data-contrast="none"><span data-ccp-parastyle="heading 3">Mechanical Engineering</span></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"134245418":true,"134245529":true,"201341983":0,"335559738":281,"335559739":281,"335559740":240}"> </span></p> <p><span data-contrast="auto">You may contribute to:</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":240,"335559739":240,"335559740":240}"> </span></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Mechanical systems and equipment used in nuclear and conventional power facilities</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Piping, pumps, valves, heat exchangers, pressure vessels, and rotating equipment</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">System design and engineering calculations</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Equipment specifications and vendor technical evaluations</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Piping and equipment layout</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Thermal-hydraulic and mechanical analysis</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Design reviews and interdisciplinary coordination</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Equipment installation, testing, startup, and commissioning</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">ASME and other applicable mechanical codes and standards</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> </ul> <p><strong><span data-contrast="none"><span data-ccp-parastyle="heading 3">Civil / Structural Engineering</span></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"134245418":true,"134245529":true,"201341983":0,"335559738":281,"335559739":281,"335559740":240}"> </span></p> <p><span data-contrast="auto">You may contribute to:</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":240,"335559739":240,"335559740":240}"> </span></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Structural steel and reinforced concrete design</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Foundations, anchorage, embedded items, and structural interfaces</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Nuclear structures, systems, and components</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Seismic and dynamic design considerations</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Site development and geotechnical interfaces</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Structural calculations and design reviews</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Construction drawings and specifications</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Constructability and modularization studies</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="58" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">ACI, AISC, ASCE, and applicable nuclear design

requirements</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> </ul> <p><strong><span data-contrast="none"><span data-ccp-parastyle="heading 3">Construction & Project Delivery</span></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"134245418":true,"134245529":true,"201341983":0,"335559738":281,"335559739":281,"335559740":240}"> </span></p> <p><span data-contrast="auto">You may contribute to:</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":240,"335559739":240,"335559740":240}"> </span></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Construction planning and sequencing</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Constructability reviews</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Work packaging and field engineering</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Site logistics and installation planning</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Modularization and prefabrication strategies</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Contractor and supplier coordination</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Engineering-to-construction interfaces</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">RFIs, field changes, and technical issue resolution</span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Quality, schedule, cost, and project controls</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="59" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Testing, turnover, commissioning, and project closeout</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> </ul> <p><strong><span data-contrast="none"><span data-ccp-parastyle="heading 3">Nuclear Licensing & Regulatory</span></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"134245418":true,"134245529":true,"201341983":0,"335559738":281,"335559739":281,"335559740":240}"> </span></p> <p><span data-contrast="auto">You may contribute to:</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":240,"335559739":240,"335559740":240}"> </span></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Nuclear licensing strategy and regulatory analysis</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Licensing basis development and

requirements management</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Preparation and review of regulatory submittals</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">NRC regulations, regulatory guides, and industry standards</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Safety analysis and technical evaluations</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Responses to regulatory questions and requests for additional information</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Engineering-to-licensing interfaces</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Regulatory research and precedent reviews</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="60" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Development of technical positions supporting nuclear deployment</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> </ul> <p><strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">Experience</span></strong></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Currently pursuing a bachelor’s or master’s degree in </span><strong><span data-contrast="auto">Mechanical Engineering, Civil Engineering, Structural Engineering, Nuclear Engineering, Construction Engineering, Engineering Management</span></strong><span data-contrast="auto">, or a closely related technical discipline.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Expected graduation between </span><strong><span data-contrast="auto">December 2026 and May 2027</span></strong><span data-contrast="auto">, with availability to begin full-time employment in </span><strong><span data-contrast="auto">Summer 2027</span></strong><span data-contrast="auto">.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Strong engineering fundamentals and demonstrated ability to solve technical problems.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Academic, internship, research, design-team, laboratory, construction, or project experience that demonstrates technical curiosity and initiative.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Ability to learn unfamiliar technical subjects quickly.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Strong analytical and quantitative skills.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Clear written and verbal communication skills.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Ability to work effectively across engineering disciplines and with people from different technical backgrounds.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">High attention to detail and respect for engineering rigor.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Willingness to ask questions, seek feedback, and take ownership of your development.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Comfort working in an environment with rapidly evolving priorities and significant individual responsibility.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Interest in nuclear energy, large-scale infrastructure, advanced engineering, or complex technical systems.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> <li data-leveltext="" data-font="Symbol" data-listid="57" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">A bias toward action and a desire to see engineering work become something that is actually built.</span><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}"> </span></li> </ul> <p><strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">

Benefits</span></strong></p> <ul> <li><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">Competitive

compensation packages</span></li> <li><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">401k with company match</span></li> <li><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">Medical, dental, vision plans</span></li> <li><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">Generous vacation policy, plus holidays</span></li> </ul> <p><strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">Estimated Starting Salary Range<br></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">The estimated starting salary for this role is $80,000 annually less applicable withholdings and deductions, paid on a bi-weekly basis. The actual salary offered may vary based on relevant factors as determined in the Company’s discretion, which may include experience,

qualifications, tenure, skill set, availability of qualified candidates, geographic location, certifications held, and other criteria deemed pertinent to the particular role. </span></p> <p><strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">EEO Statement<br></span></strong><span data-ccp-props="{"134233117":false,"134233118":false,"134245417":false,"201341983":0,"335559738":0,"335559739":0,"335559740":240}">The Nuclear Company is an equal opportunity employer committed to fostering an environment of inclusion in the workplace. We provide equal employment opportunities to all qualified applicants and employees without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other protected characteristic. We prohibit discrimination in all aspects of employment, including hiring, promotion, demotion, transfer,

compensation, and termination.</span></p> <div><strong>Export Control</strong><br>Certain positions at The Nuclear Company may involve access to information and technology subject to export controls under U.S. law. Compliance with these export controls may result in The Nuclear Company limiting its consideration of certain applicants.</div> <div> </div> <div><strong>Recruiting Fraud Alert</strong><br>Your safety is our priority. We want to ensure your job search stays secure. Please note that

the team at The Nuclear Company only communicates through official <strong>@thenuclearcompany.com</strong> email addresses. We will never ask for payments or sensitive financial information at any stage of our recruitment process. For your peace of mind, please verify all openings and submit your applications directly through <a href="https://www.thenuclearcompany.com/careers"><strong>our official careers page</strong></a>.</div>

About The Nuclear Company

The Nuclear Company enables the deployment of many nuclear power plants at fleet-scale by integrating a broad coalition of industry partners and government support, and creating synergies between them through comprehensive program management.

Other roles at The Nuclear Company

Interested?

Let me introduce you to the founders.

Skip the process

Refer someone

Know someone great for this role?

Share your link. If they get hired through Standout, you get $3,000.

Job details

Salary

$80,000 - $80,000

Location

Washington, South Carolina + 3 more

Company

NameThe Nuclear Company
IndustryClean Energy
Team Size3

Funding

Total raised

$51M

Last stage

Series A

Investors

EEclipse
CCIV
True Ventures
WWonder Ventures
GGoldcrest Capital

Founders

PM

Patrick Maloney

Co-Founder & Chairman

KB

Kiran Bhatraju

Co-Founder & Board Member

Jonathan Webb

Jonathan Webb

Co-Founder & CEO

LinkedIn

What happens next.

No applications, no recruiter spam. Just the intro.

01

Confirm the fit

A few questions to make sure this role is the right shape for you. Two minutes.

02

I pitch you to the company

I write the intro, send it to the founder, and handle the back-and-forth.

03

A meeting lands on your calendar

If they’re a yes, I book the chat. You show up — that’s the whole job-hunt.